
Pass SAP C-TS422-2504 exam questions - convert Test Engine to PDF
Pass Your C-TS422-2504 Exam Easily - Real C-TS422-2504 Practice Dump Updated Apr 30, 2026
SAP C-TS422-2504 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
| Topic 7 |
|
NEW QUESTION # 39
What are prerequisites for a production version to be selected for a production order? Note: There are 3 correct answers to this question.
- A. The production quantity must lie within the lot-size range of the production version.
- B. The production version must NOT be deleted.
- C. The basic start date of the order must lie within the validity period of the production version.
- D. The production quantity must only lie within the lot-size range of the routing in the production version.
- E. The basic end date of the order must lie within the validity period of the production version.
Answer: A,C,D
NEW QUESTION # 40
Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question.
- A. Planned orders (firmed)
- B. ATP quantities
- C. Planned orders (unfirmed)
- D. Production orders
Answer: A,D
NEW QUESTION # 41
What can you use standard heuristics in Advanced Planning (PP/DS) for?
- A. To automate material movements in material staging
- B. To solve planning problems for defined objects
- C. To optimize costs and times in production plans
- D. To set default values in production master data
Answer: B
NEW QUESTION # 42
Your production planners are allowed to execute planning only for specific resources. How can you achieve this in Advanced Planning (PP/DS)?
- A. Use a propagation range.
- B. Use a planning area.
- C. Use a resource group.
- D. Use a planning group.
Answer: C
NEW QUESTION # 43
Your quality department detects a deviation in a raw material batch. Unfortunately this batch has already been used in production. How can you identify all affected finished goods stocks?
Note: There are 2 correct answers to this question.
- A. Use batch derivation.
- B. Use batch determination.
- C. Use the batch whereused list.
- D. Use the Batch Information Cockpit.
Answer: C,D
NEW QUESTION # 44
What are the possible results of a production planning run in Advanced Planning (PP/DS)? Note: There are 2 correct answers to this question.
- A. Purchase order
- B. Production order
- C. Scheduling agreement schedule line
- D. Planned order
Answer: C,D
NEW QUESTION # 45
What are the prerequisites for a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. Defining the relevant work centers in the routing
- B. Activating the reporting point backflush in the order dependent parameters
- C. Defining the operations as reporting points using the control key
- D. Activating the reporting point backflush in the work centers
Answer: C,D
NEW QUESTION # 46
What are some SAP recommended guiding principles to achieve clean core operations? Note: There are 3 correct answers to this question.
- A. Establish an organizational structure technical foundation transformation methodology for clean core.
- B. Establish regular housekeeping tasks procedures.
- C. Integrate clean core practices in the endtoend value process chain.
- D. Establish release management.
- E. Define roles responsibilities as part of a process transformation office.
Answer: A,D,E
NEW QUESTION # 47
You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received.
Which planning strategy supports the consumption of planned independent requirements by dependent requirements for the semi-finished material?
- A. Planning at assembly level (70)
- B. Production by lot size (30)
- C. Assembly processing with production orders (82)
- D. Planning with final assembly (40)
Answer: A
NEW QUESTION # 48
What can you use stard heuristics in Advanced Planning (PP/DS) for?
- A. To optimize costs times in production plans
- B. To automate material movements in material staging
- C. To solve planning problems for defined objects
- D. To set default values in production master data
Answer: C
NEW QUESTION # 49
What are some benefits of planning with planned independent requirements for finished materials? Note: There are 2 correct answers to this question.
- A. Option to forecast planning for production resources
- B. Option to use maketoorder production
- C. Reduced delivery times
- D. Reduced times for final assembly
Answer: C,D
NEW QUESTION # 50
What are some SAP recommended guiding principles to achieve clean core operations?
Note: There are 3 correct answers to this question.
- A. Integrate clean core practices in the end-to-end value process chain.
- B. Establish regular housekeeping tasks and procedures.
- C. Define roles and responsibilities as part of a process transformation office.
- D. Establish an organizational structure, technical foundation, and transformation methodology for clean core.
- E. Establish release management.
Answer: C,D,E
NEW QUESTION # 51
Which of the following elements does MRP take into account during net requirement calculation?
Note: There are 2 correct answers to this question.
- A. Planned orders (firmed)
- B. ATP quantities
- C. Planned orders (unfirmed)
- D. Production orders
Answer: A,D
NEW QUESTION # 52
What does the material type influence?
Note: There are 2 correct answers to this question.
- A. Which material master screens appear in which sequence
- B. Whether the material is produced inhouse procured externally or both
- C. Which document types class categories are allowed
- D. Which plantspecific plantindependent statuses are allowed
Answer: A,C
NEW QUESTION # 53
Which objects can you change with a change number?
Note: There are 2 correct answers to this question.
- A. Bill of material
- B. Production order
- C. Work center
- D. Routings
Answer: A,D
NEW QUESTION # 54
Which of the following questions do you have to answer before you start creating a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. In which storage location is the BOM required?
- B. Which base unit of measure must the BOM have?
- C. When does the BOM need to become effective?
- D. For which plant can the BOM be defined?
Answer: C,D
NEW QUESTION # 55
Which time elements does MRP consider in backward scheduling to determine the basic dates for components from dependent requirements? Note: There are 2 correct answers to this question.
- A. In-house production time
- B. Operation duration
- C. Planned delivery time
- D. Total replenishment lead time
Answer: A,C
NEW QUESTION # 56
Which information is required when you create a product master in SAP S/4HANA Cloud Private Edition? Note: There are 2 correct answers to this question.
- A. Base unit of measure
- B. Selection screen for views
- C. Product type
- D. Industry sector
Answer: A,D
NEW QUESTION # 57
How can you set up a material as a phantom assembly? Note: There are 2 correct answers to this question.
- A. Use a special item category in your material BOM (bill of material).
- B. Define the special procurement type inside the material BOM (bill of material).
- C. Select a special MRP type inside the material master.
- D. Select a special procurement type inside the material master.
Answer: B,D
NEW QUESTION # 58
Which settings can you make in a production scheduling profile?
Note: There are 3 correct answers to this question.
- A. Automatic print on order creation
- B. Automatic goods receipt on confirmation
- C. Automatic goods issue on confirmation
- D. Default order types
- E. Automatic release on order creation
Answer: B,D,E
NEW QUESTION # 59
Which of the following processes lead to an indicator in the planning file?
Note: There are 2 correct answers to this question.
- A. Changing a storage bin
- B. Changing a delivery address
- C. Changing an operation time
- D. Changing a dependent requirement
Answer: C,D
NEW QUESTION # 60
What are some advantages of using Kanban for material supply? Note: There are 2 correct answers to this question.
- A. Material is only kept available in small quantities in production.
- B. Replenishment is only triggered when components are required.
- C. Replenishment is always triggered on a regular basis.
- D. Material stock is built up for a long period of time in production.
Answer: A,B
NEW QUESTION # 61
......
C-TS422-2504 Real Exam Questions and Answers FREE: https://actualtests.trainingquiz.com/C-TS422-2504-training-materials.html

